Table 1-1.
OPERATORS PREVENTIVE MAINTENANCE CHECKS AND
B - Before
W - Weekly
AN - Annually
D - During
M - Monthly
S
- Semiannually
A - After
Q - Quarterly
BI
- Biennially
ITEM
NO,
2
lN-
TER
V AL
B
D
w
D
M
B
ITEM TO BE INSPECTED
PROCEDURE
TM 5-3610-259-14
SERVICES (Cont)
(Number) - Hundreds of Hours
VAN BODY
INSPECT INTERIOR (Cent).
3 .
Inspect plug connectors to be sure all plug
connectors are tight and firmly seated. Tighten
if necessary.
4 .
Check bulbs and fluorescent lamps. Replace if
necessary.
5 .
Inspect walls, ceiling, and floor for holes,
open seams, or signs of seepage or leaks.
6.
Check storage cabinets for broken hinges,
latches, and locks.
7.
Inspect fire extinguishers. Be sure security
seals are not broken.
8.
Inspect circuit breaker panel.
NOTE
Inspection is to be conducted on a
not-to-interfere basis with work be-
ing conducted.
Individual equipment
will be inspected as directed by the
appropriate chapter of this manual.
For Readiness
Reporting,
Equipment is
Not Ready/
Available If:
Leaks are
present.
Broken
hinge/latch/
lock.
Fire extin-
guisher is
missing or
seal is
broken.
Defective
circuit
breaker.
1-21