TM 5-6675-322-14
Table 1-1.
OPERATOR PREVENTIVE MAINTENANCE CHECKS AND SERVICES - Cont
B - Before
W - Weekly
AN - Annually
D - During
M - Monthly
S - Semiannually
(Number) - Hundreds of Hours
A - After
Q - Quarterly
BI
- Biennially
ITEM TO BE INSPECTED
PROCEDURE
VAN BODY - Cont
2
I n s p e c t I n t e r i o r - C o nt
For Readiness
Reporting,
Equipment Is
Not Ready/
Available If:
Q
a.
Set main circuit breaker to ON.
b. Set each circuit breaker to OFF, then ON.
9.
Inspect
light
traps.
1-22
ITEM
NO.
IN-
TER
VAL