TM 5-3610-286-20
2-90.
Pile Lift Motors, Feeder (cont).
d. Install. (figure 2-255)
WARNING
(1)
(2)
(3)
(4)
(5)
Equipment exceeds 35 pounds. Second person must support equipment while
performing steps (1) and (2).
Install pile lift motor (1), four washers (2), and two hex bolts (3).
Install washers (4) and hex-head bolt (5).
Install pile chain (6) and connect chain ends at master link.
Replace three tagged blue leads (7) and terminal hex nuts (8). Remove tags.
Replace terminal box (9), cover (10), four washers (11), and slotted screws (12).
NOTE
FOLLOW-ON MAINTENANCE:
(1) Install feeder guard (para. 2-89).
(2) Install main control box panel (para. 2-93).
(3) Adjust feeder chain timing (para. 2-96).
2-516